Latest Part.
- DryMartini
- Posts: 640
- Joined: Wed Sep 22, 2004 3:00 pm
- Location: Palatine, Illinois
- Contact:
Latest Part.
Here is the latest progress on the B-17C feasibility project.
A tail fairing attachment block in the process of being milled.
See "Final Cut" for more information. Better yet, help us out!
PM me if you are interested. Or, help with the B-17E if you like
the looks of the "Big Tailed Bird" better.
-Bill
B-17E 41-2595 "Desert Rat" Restoration Team
B-17E 41-2595 "Desert Rat" Restoration Team
- DryMartini
- Posts: 640
- Joined: Wed Sep 22, 2004 3:00 pm
- Location: Palatine, Illinois
- Contact:
Latest Finished Parts 51-128
And the finished blocks.
P/N: 51-128 Block - Tail Fairing Attach
Replaces P/N: 21-6213
Used on Assy 65-3470
P/N: 51-128 Block - Tail Fairing Attach
Replaces P/N: 21-6213
Used on Assy 65-3470
-Bill
B-17E 41-2595 "Desert Rat" Restoration Team
B-17E 41-2595 "Desert Rat" Restoration Team